Valentine’s Day Mulumbimby Bridge Closure for Flood Gauge Repairs

  • Post category:Byron Bay
Photo: Google

MULLUMBIMBY’S FEDERATION Bridge will be closed to traffic for three hours on Valentine’s Day, 14 February so the flood gauge can be repaired.

The flood gauge is important because it gives people a clear indication of the level of flood water and this allows people to make important decisions about the potential impact on their properties or access to their homes.

The gauge readings are automated and feed directly to the Bureau of Meteorology but they are currently not correlating with what we are seeing when we do a manual reading said James Flockton, Council’s Drainage and Flood Engineer.

[xyz-ihs snippet=”Servo”]

“It is vital that the manual readings and the data being sent to the Bureau of Meteorology are exactly the same because the Bureau will provide that information to Emergency Services and the general public,” Mr Flockton said.

“We have to get a crane to lower a person in a work box over the side of the bridge to repair the gauge and this means both lanes of the bridge will be closed,” he said.

It is expected that the closure will be for approximately three hours from 10am-1pm on 14 February, weather permitting. There will be no problem getting access to properties but alternative routes will be required in and out of Mullumbimby.

Council apologises for any inconvenience but it is essential the flood gauge on the Federation Bridge is operating properly.

Many residents and landholders have been notified of the closure by mail. Schools and buses will also be informed.


[xyz-ihs snippet=”MCG-480w-01″]

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.